Blue Creek Bridge & Mill Creek Road (MP 8.0 to MP 9.4)

CRP-15-01-Before


CRP Number:
15-01 and 10-04

Funding Source:
County and Federal (STPR and FLAP)

Project Cost:
$9.7M

Construction Date:
2018

Completion Date:
2019
The Blue Creek Bridge and the Mill Creek Road projects were combined to save on construction costs. The Blue Creek Bridge project will replace the existing 80 foot bridge with a single span 131 foot bridge. Both roads will be realigned  and widened. The Mill Creek Road will replace an existing 100 ft. bridge with a single span 168 ft. bridge relocating the bridge south to the original channel. Mill Creek Road will also be realigned and widened. Temporary detour bridges will be provided at both sites.

Update:
Scarsella Bros. has resumed work after the winter shut down. Expect traffic delays throughout the day until projects are completed. The planned construction completion date is November 8, 2019.

Project Documents:

Contact Information:
Seth Walker, PE
Chief of Engineering and Construction
(509) 524-2710
Email